5 Early Warning Signs Your Project Is Headed for Trouble (and What You Can Actually Do About It)

June 4, 2025

Projects rarely fail overnight. They unravel slowly — through missed signals, disengaged stakeholders, and unmanaged change. At FiftyOne Consulting, we help organizations design and implement high-performance project delivery ecosystems that prevent these issues from arising in the first place. Here are five signs your project may be in trouble — and what to do about it.

1. Deadlines Are Slipping (Consistently)

A missed deadline isn’t a crisis. A pattern of missed deadlines is a signal that deeper issues are present — such as unclear priorities, overallocated resources, or unacknowledged scope changes. In many organizations, teams are pulled in too many directions, and conflicting "#1 priorities" cause delivery chaos.

What to do:

  • Re-align stakeholders around a realistic and adaptive project timeline.
  • Establish regular status reporting and escalation cadences to surface risks early.
  • Implement a dynamic project plan that reflects critical path changes and downstream impacts.
  • Use daily standups to surface blockers and share ownership of delivery challenges.

2. Scope Creep is Growing Wildly

Little changes feel manageable until they compound into a bloated, off-track project. Without documentation or a change process, teams lose sight of the original goals — and delivery doubles in size and time.

What to do:

  • Create a clear scope baseline at project kickoff.
  • Introduce a simple change request process with at least one layer of formal review.
  • Conduct impact assessments when changes are introduced, including effects on timeline, resources, and risk.
  • Document changes and distribute updates to keep teams aligned.

Pro Tip: Even informal organizations benefit from lightweight documentation. It’s not bureaucracy — it’s clarity.

3. Team Morale is Sinking

Low energy, vague updates, disengagement — these are signs your team is losing motivation and clarity. Often, the causes are upstream: unclear expectations, constant change, or perceived lack of progress.

What to do:

  • As the project leader, model steady, visible optimism (even on tough days).
  • Address alignment issues quickly and transparently.
  • Celebrate small wins visibly, especially in executive summaries and IC standups.
  • Use Agile-style delivery to deliver incremental value and create momentum.

4. Stakeholders Are Disengaged or Micromanaging

Disengaged sponsors signal apathy. Micromanaging ones signal fear. Both destroy trust and efficiency. And both are usually signs that communication and expectations aren't aligned.

What to do:

  • Set clear roles and responsibilities for all stakeholders upfront.
  • Reinforce expectations through a structured communication plan and steering committee cadence.
  • Re-engage sponsors with executive-friendly reporting that highlights decision points.
  • With micromanagers, proactively ask: What type of updates or detail helps you feel informed and confident?

Pro Tip: Many execs don’t know what their role in a project should be. Help them succeed by defining it clearly and early.

5. No Active Risk Management

If no one’s talking about risk — that’s the biggest risk of all. Risk management is often skipped because teams think it’s a "later" activity. But waiting until an issue arises is a guarantee of reactive firefighting.

What to do:

  • Launch a Risk Log in Week 1 — even if it’s just 5–10 items.
  • Use a basic impact/probability matrix to prioritize mitigation plans.
  • Revisit and adjust risk assumptions at each phase gate or sprint review.
  • Include sponsors in risk reviews to create shared ownership.

Final Thoughts

Whether you're leading a critical initiative or supporting a portfolio of programs, catching warning signs early is essential to keeping momentum and trust. The most effective teams put the right delivery systems in place before things go off the rails.

At FiftyOne Consulting, we help businesses implement scalable, resilient delivery frameworks so these patterns become the exception — not the norm.